Vodafone Headquarters – Madrid

Campos Corporación designs, projects and constructs the building complex where Vodafone Spain will move its headquarters, which has a total area of 50,682 square meters packaging is complete. The new business complex , located at 115 Avenida de America , consists of five seven-storey buildings and a central plaza adaptable for different uses. Campos Corporación has…

Vodafone Corporate Headquarters in Barcelona

Construction and refurbishment proyect in Vodafone Corporate Headquarters in Barcelona, besides the headquarters of Moral Madrid, Vigo, Valencia, Mallorca, Murcia and Alicante. Complete Construction of office buildings and corporate headquarters, coordinating all phases of work: design and drafting of engineering, processing, work execution and coordination of subcontractors, manufacturing corporate furniture, corporate image and signage, lighting…

Vodafone “Turnkey” Stores

More than 800 projects “turnkey” implemented throughout the national territory for Vodafone. We own to implement and electrical installations, construction of floors and roofs, siding, masonry and plumbing, air conditioning and lighting, sound, fire, security and surveillance, windows, technology and automation, painting, etc.

Segurcaixa Adeslas Dentist’s

Campos Corporación has held in Cartagena building a new dental clinic Adeslas, Spain’s leading private healthcare sector. To date, they have already successfully completed construction projects clinics Valencia, Elche and Torrent. The insurance, health insurance specialist and delivery of health services, since early this year began a renovation of its corporate image, a process in…

Corporate furniture manufacturing bespoke

We have our own production plant in which furniture, wood specialists and based on the designs of our architects manufacture standard furniture, custom furniture, cabinets, fixtures, counters, displays, panels, wood shelves for shops, carpet exclusive timber. We are also experts in modular furniture with materials such as solid wood, MDF, melamine, veneer, laminate, plexiglass, polycarbonate.…

ArteSiete Holea Cinemas – Huelva

Artesiete Cinemas, located at the Mall Holea, have a floor area of 4,450 square meters, eight rooms and has capacity for over 1500 seats. The Company started this great project in July 2013 and has carried out comprehensive management work, including the work of installing electrical and electronics, construction of floors and roofs, siding, masonry…

Plant Management Service in Data Processing Centers for Vodafone

From Campos Corporación, we conduct the Management Service domestic plant for Vodafone nationwide including managing all stakeout and infrastructure that are made in IT within 200 data processing centers in Spain that Vodafone has. In Process – Annual The necessary infrastructure after stake includes the installation of complete platforms providers Vodafone, air pipes and “falsosuelo”…

Over 5.000 km of installed optical fiber

Over 5,000 km of optical fiber installed in the country, highlighting cities like Fuenlabrada, Coslada, Parla, Vallecas, Torrelodones or Valladolid and sites like Metro de Valencia, Alicante Renfe station, IFEMA, La Moraleja, Atocha, Hospital de Arganda, etc. Installing lying on the main streets of Madrid: Calle Colón, Gran Vía, Castellana, Plaza Castilla, M-30. – Installation…

Other actions in mobile phone base stations

Storage, installation and configuration of radio links SWAP, design and installation of indoor coverage in different locations, reorienting antennas, capacity expansion projects of telecommunications facilities, microcell facilities, installation, commissioning and maintenance of Data Processing Centers including management and infrastructure stakeout. – Mimo Proyect: capacity expansion in Telecommunications facilities Santiago Bernabeu Stadium and other sites of…

Installation of 21 MW solar farms in the UK

The scope of this work has included the installation of low voltage electrical network and land on both floors, including installation of boxes, connecting investors, installation of the monitoring system and other ancillary services. Ending Project: March 2013 The project involved the installation of low voltage electric two solar farms on fixed structure: the first…

3.6 MW Photovoltaic Garden nominal potential of fixed structure “Del Conde-Los Santos” – Andújar, Jaén

Campos Corporación has undertaken the construction of a solar farm of 3.6 MW rated power in the town of Andújar (Jaén). The Company executed the tasks related to low voltage electrical installation, from the connection of photovoltaic modules forming the different series and connection boxes with string to wire the inverter. Also took place throughout…

2 MW photovoltaic garden nominal potential two-axis tracking “Quero Solar” – Alcázar de San Juan, Ciudad Real

Campos Corporación acts as promoter and takes care of all necessary administrative processing (application point of connection to the distribution company, registration of industry, building permits in the City Council, environmental impact study, …) and position of land where the park and the various investors who participate in the construction of the same is located,…

Energy Audits in Public Lightning

The main objective of the audits is to obtain a complete picture of the energy status of the lines of outdoor lighting. We perform photometric studies, analysis of different sectors of each population, electricity consumption and electricity billing review. The result is brought to the state of the outdoor lighting and proposing improvements.